
Affichage de 2189 résultats
description archivistiqueNo. 11 - Dauphin
No. 11 - Dauphin
Map of same.
Map of same.
Original/transparency of southeastern Manitoba land use problem areas.
Original/transparency of southeastern Manitoba land use problem areas.
Watershed areas and drainage maintenance systems in Manitoba's southern portion.
Watershed areas and drainage maintenance systems in Manitoba's southern portion.
Field 6 - fertility projects, 1919, and Field 8 - soil cultivation projects
Field 6 - fertility projects, 1919, and Field 8 - soil cultivation projects
Fertility field - organized 1919, revised 1946, map date
Fertility field - organized 1919, revised 1946, map date
Fertilizer applied to wheat on fallow
Fertilizer applied to wheat on fallow
Land settlement project (cultivated acreage on leased crown lands)
Land settlement project (cultivated acreage on leased crown lands)
Land settlement project (design for secondary drains)
Land settlement project (design for secondary drains)
Grasses vs alfalfa (figure 4)
Grasses vs alfalfa (figure 4)
Five year average yields of wheat on stubble land (figure 6)
Five year average yields of wheat on stubble land (figure 6)
High water mark
High water mark
Reclamation: Riesen & Kuiper
Reclamation: Riesen & Kuiper
Unsurveyed land in the Pasquia area
Unsurveyed land in the Pasquia area
Reclamation: The Blackwell Scheme (Revision)
Reclamation: The Blackwell Scheme (Revision)
Field observations by Kimball & Anderson (Revision)
Field observations by Kimball & Anderson (Revision)
Plan of primary roads and drains
Plan of primary roads and drains
Drainage system proposed by G.F. Horsey for Dominion Department of the Interior, 1924 (Revision)
Drainage system proposed by G.F. Horsey for Dominion Department of the Interior, 1924 (Revision)
Drainage unit blocks (Revision)
Drainage unit blocks (Revision)
Dykes and drains completed
Dykes and drains completed
Revision of The Biezeveld Scheme
Revision of The Biezeveld Scheme
Reclamation: E.B. Patterson's 1st proposal draft (Revision)
Reclamation: E.B. Patterson's 1st proposal draft (Revision)
Reclamation: E.B. Patterson's 2nd proposal draft
Reclamation: E.B. Patterson's 2nd proposal draft
Surface deposits (Revision)
Surface deposits (Revision)
Figure 4 of above series (design drainage system)
Figure 4 of above series (design drainage system)
Location plan for Pasquia project road, contract no. 3
Location plan for Pasquia project road, contract no. 3
Piney and nearby townships as census district no. 21
Piney and nearby townships as census district no. 21
Monthly temperatures (figure 2)
Monthly temperatures (figure 2)
Waskada Undulating Phase East of Killarney Showing Erosion (two views)
Waskada Undulating Phase East of Killarney Showing Erosion (two views)
Topography - Manitou Clay Loam (three views)
Topography - Manitou Clay Loam (three views)
Résultats 61 à 90 sur 2189